Metal gutter with a mesh gutter guard on a tile roof

Pricing guide

Zone 0 cost guide for Los Angeles

Zone 0 work is priced by the job: perimeter size, roof and deck access, haul volume and materials set the total. For scale, a 2024 California study put a 5-ft gravel band around a 1,000 sq ft home at about $2,782 and a targeted ember package at $10,000–$15,000.

Market estimates

What common upgrades cost in California

Market estimate · not our price
California market estimates for wildfire upgrades
ItemScopeEstimate
Zone 0 gravel conversionDig out bark mulch, remove plants, lay pea gravel ~3 in deep in a 5-ft band around a 1,000 sq ft footprint (deck not included)≈ $2,782 (+ ≈ $100 weed barrier)
Ember-resistant foundation ventFlame- and ember-resistant vent, installed≈ $229 each
Ember-resistant gable-end ventIncluding demolition and installation≈ $421 each
Ember-resistant eave ventEnclosed eave, material + labor≈ $106 each
Metal gutter guardInstalled per linear foot≈ $4.48 / ft
Metal gutter with guardReplace a 40-ft vinyl gutter on one side≈ $930
Deck-to-wall flashingMetal flashing at the deck–house joint≈ $2.74 / ft
Small deck retrofit10×10 ft deck: composite boards, joist tape, wall flashing≈ $2,500–$3,000
Noncombustible fence near the houseFirst 5–10 ft, 8 ft tall, both sides of the home≈ $9,670
Window upgradeOne 2×3 ft wildfire-resistant window, plus trim work≈ $755 + $400–$500
Targeted ember packageVents, deck flashing, gutter guards and gravel mulch on a typical 2,000 sq ft California home≈ $10,000–$15,000

Source: Headwaters Economics, “Retrofitting a Home for Wildfire Resistance” (Spring 2024). Study figures use 2023 RSMeans data calibrated for Northern California; the authors note Southern California costs tend to fall within 10%. They are market estimates for comparison, not Zone Zero LA prices. Checked November 28, 2026.

These figures come from a published study, not from our quotes. Our own price for your property comes in a written estimate after the walk-through, and may be higher or lower depending on scope, materials, access and location.

Our pricing

How Zone Zero LA prices each service

Pricing basis by service
ServicePricePriced by
Zone 0 assessmentRequest a quoteProperty size and scope of review
Zone 0 cleanupRequest a quotePerimeter, roof/gutter access, under-deck work, haul volume
Noncombustible landscapingRequest a quoteArea, material and irrigation changes
Home hardeningRequest a quoteEach upgrade; specialist work quoted separately
Brush clearance (Zones 1–2)Request a quoteArea, slope/access and haul volume

Factors

What affects the price

Cost factors for Zone 0 work
FactorWhy it matters
Size of the 0–5 ft perimeterZone 0 runs 5 ft out from every wall, attached deck and stair.
Roof and gutter accessHeight, pitch and number of stories change setup time.
Under-deck and stair clearanceLow, tight spaces are slow hand work.
Green-waste volumeHauling and disposal depend on how much is removed.
MaterialsGravel, stone, pavers, concrete, vents or gutter guards are itemized.
Specialist or permitted workRoof, window, door or structural deck work is coordinated and quoted separately.

Cost of waiting

What the City charges instead

City of Los Angeles brush-clearance fees, 2026. Source: LAFD 2026 owner notice. Bar heights show order, not scale.

Full 2026 LAFD fee guide →

FAQ

Pricing questions

Do you publish starting prices?

Not yet. Every job is priced after a walk-through with a written, itemized estimate. The study figures on this page are market estimates, not our prices.

Why does Zone 0 cost vary so much?

Perimeter size, roof and deck access, how much material is removed or installed, and whether specialist or permitted work is needed all change the total.

What is the cheapest thing I can do?

Removing flammable material near the house, clearing gutters and cleaning debris off the roof cost little or nothing when you do them yourself, according to the Headwaters Economics study.

Can ignoring an LAFD notice cost more?

Yes. In 2026 the City lists $31 after a failed inspection, $758 after a second failure, and $1,740 plus contractor costs if the City clears the property.