Key facts
Los Angeles at a glance
- Fire zone
- LAFD program covers the City's Very High Fire Hazard Severity Zone
- Clearance
- 200 ft from structures; 10 ft from roads and combustible fences
- 2026 inspections
- May 1 – June 30, then year-round upkeep
- City fees 2026
- $31 → $758 → $1,740 + costs
Who's who
The offices that matter for LA homes
LAFD Brush Clearance Unit
Runs the annual defensible-space inspections and notices. Track your parcel on the LAFD FIMS portal.
LADBS (Building and Safety)
Issues building permits. Same-size window/door swaps and Class A re-roofs are express permits — see the LADBS list.
ZIMAS
The City's parcel map. Check your parcel's details and hazard zones on ZIMAS parcel map.
Board of Forestry
Writes the statewide Zone 0 rule, still in final review — status page.
Local rules
What LAFD requires within 200 feet
- 200 ft from structures and 10 ft from roadsides or combustible fences: grass cut to 3 in; native brush reduced to 3 in (spaced native shrubs 18 ft apart can stay if trimmed up a third).
- Trees over 18 ft: no foliage within 6 ft of the ground. Trees and shrubs under 18 ft: lower branches removed to a third of their height. All dead trees and plants removed.
- Chimneys: foliage at least 10 ft from the chimney outlet.
- Roofs: no heavy build-up of leaves, needles or twigs, and 5 ft of vertical clearance under overhanging branches.
- Cut material: hauled away legally, or chipped and spread no deeper than 3 in within 30 ft of structures (6 in beyond), and never within 10 ft of a usable roadside.
Source: LAFD 2026 owner notice and LAFD brush clearance requirements. LAFD is the final authority on compliance. Checked November 29, 2026.

Zone 0 in LA
Where Zone 0 fits in Los Angeles
LAFD's 200-foot rule is about vegetation. Zone 0 is about the first 5 feet next to walls, attached decks and stairs, where embers ignite mulch, leaves and wood. The state rule is not in force yet, but the work is the same either way and fits into the same visit as brush clearance.
The City Council has asked LAFD to report on local Zone 0 options (council file 10-2468-S2). We follow both the state package and any City action and update this page when either changes.

LA properties
What makes LA homes different
Hillside lots
Steep yards and long stair runs make hand clearing and hauling slower, and the 200-ft line often crosses slopes below the house.
Decks over slopes
Raised wood decks collect leaves underneath and catch embers carried up the hill. The space below counts in Zone 0.
Older vents and eaves
Many older homes have open eaves and coarse vent screens. Ember-resistant vents and enclosed eaves close those gaps.
Narrow streets
Tight canyon roads limit truck size and parking, which affects hauling time and cost.
Permits
Permits and timing in Los Angeles
No permit, usually: Zone 0 cleanup, brush clearance, debris hauling and swapping mulch for gravel.
Express permit (no plan check): same-size, same-type window and door change-outs, and re-roofs with Class A or B covering under 6 lb/sq ft. Class A is required in the Very High Fire Hazard Severity Zone (LADBS).
Plan check: structural deck rebuilds and larger changes. Timing depends on the project and LADBS workload, so we build it into your plan rather than guess a date.

City fees
What failing an inspection costs
Palisades-fire parcels may be exempt from the $31 fee but still get a non-compliance notice if they fail. Bills are mailed from August, and late payment adds a 200% penalty.
Source: LAFD 2026 owner notice.
Local costs
What upgrades cost
Market estimate · not our price| Item | Scope | Estimate |
|---|---|---|
| Zone 0 gravel conversion | Dig out bark mulch, remove plants, lay pea gravel ~3 in deep in a 5-ft band around a 1,000 sq ft footprint (deck not included) | ≈ $2,782 (+ ≈ $100 weed barrier) |
| Ember-resistant foundation vent | Flame- and ember-resistant vent, installed | ≈ $229 each |
| Metal gutter guard | Installed per linear foot | ≈ $4.48 / ft |
| Small deck retrofit | 10×10 ft deck: composite boards, joist tape, wall flashing | ≈ $2,500–$3,000 |
| Targeted ember package | Vents, deck flashing, gutter guards and gravel mulch on a typical 2,000 sq ft California home | ≈ $10,000–$15,000 |
Source: Headwaters Economics, “Retrofitting a Home for Wildfire Resistance” (Spring 2024). Study figures use 2023 RSMeans data calibrated for Northern California; the authors note Southern California costs tend to fall within 10%. They are market estimates for comparison, not Zone Zero LA prices. Checked November 28, 2026.
We found no reliable published Los Angeles prices for brush clearance or Zone 0 assessments, so those are quoted after a walk-through.
Services
Our services in Los Angeles

Zone 0 assessment
Walk-through, photos and a prioritized plan.
Details →
Zone 0 cleanup
Clear what burns within 5 ft.
Details →
Noncombustible landscaping
Gravel, stone, pavers and concrete near walls.
Details →
Home hardening
Vents, gutters, eaves, windows, decks, fences.
Details →
Brush clearance (Zones 1–2)
Vegetation, trees and brush out to 200 ft.
Details →How it works
How a Los Angeles job runs
Request
Send the quote form or ask for a callback. Include your address and any notice or deadline.
Walk-through
We walk Zone 0, the roof line, vents, decks and stairs and photograph what we find.
Written plan + estimate
You get a prioritized work plan with an itemized estimate for each step.
Work + records
We do the work you approve and send before-and-after photos for your records.
FAQ
Los Angeles questions
Is my Los Angeles property in the brush-clearance program?
LAFD runs the program in the City's Very High Fire Hazard Severity Zone and mails a notice to owners it will inspect. Look up your parcel on ZIMAS parcel map, or register it on the LAFD FIMS portal to see its inspection status.
When does LAFD inspect?
For 2026, LAFD's notice said initial inspections would run from May 1 to June 30, and parcels compliant by May 1 avoid the $31 fee. LAFD treats clearance as a year-round duty, so plan to clear more than once a year.
What happens if I fail?
In 2026: $31 after a failed first inspection, plus $758 if the second inspection also fails. After that, City contractors clear the parcel and bill the owner their bid plus a $1,740 administrative fee. Late payment adds a 200% penalty. See LAFD fees.
Do I need a permit for hardening work in LA?
Clearing, hauling and gravel usually don't. LADBS lists same-size window and door change-outs and Class A or B re-roofs (Class A in the Very High Fire Hazard Severity Zone) as express permits with no plan check. Structural deck or larger changes go through plan check.
Does the state Zone 0 rule apply in Los Angeles yet?
Not yet. As of November 29, 2026, the Board of Forestry says the Zone 0 package is still in final review with the Office of Administrative Law. The City Council has also asked LAFD to report on local options; see City council file 10-2468-S2.
Which Los Angeles neighborhoods do you serve?
Send your address on the quote or callback form and we confirm coverage before anything is scheduled.
Keep reading
